How many dumpsters will this teardown fill?
Describe the building, the flat concrete coming out, or both. The estimate updates as you type, and the slider shows how the count changes with each roll-off size.
0 dumpsters
20-yard roll-off
20-yard container for concrete
About 22 × 8 × 4 ft, the only size used for concreteEvery size, side by side
| Size | Needed by volume | Needed by weight | Dumpsters |
|---|
How this is estimated
Building debris weight comes from per-square-foot factors for each construction material, adjusted for the building type. A full wood-frame teardown works out near 55 lbs per square foot before the foundation, which lines up with published averages for residential demolition once a slab is included. Masonry, steel and concrete buildings use heavier factors.
Flat concrete is figured from area and thickness at 150 lbs per cubic foot, so a 4-inch slab weighs about 50 lbs per square foot. Broken up, it takes roughly twice its in-place volume and is loaded at about 2,000 lbs per cubic yard.
The dumpster count is whichever is higher: the count needed to fit the volume, or the count needed to stay under the weight allowance. All concrete, from flatwork or a removed foundation, is counted in 20-yard concrete containers with their own weight allowance. They are usually filled only to a marked line so the load stays liftable. Treat the result as a planning estimate and confirm sizes, weight limits and overage fees with your hauler before you book.